CN
CN
Mr. Mou Guangfeng (the Environmental Impact Assessment inspector of the State Environmenta
2014-06-25

          In the afternoon of 6th May 2014, the inspector Mou Guangfeng and related 11 experts visit the Hai’an TY Environmental Protection Energy co., Ltd for inspection and guidance. 

傳金娛樂城

        The chairman Yan Shengjun accompanied Mou Guangfeng inspects the main plant in Hai’an, the sand table in the hall of first floor, central control room of second floor, crane operation room of fifth floor. Mr. Song Changguang (the general manager of Hai'an plant) introduced Hai’an waste incineration power generation planning concept, incineration process, key technology and operation situation to the guests.
         Mou Guangfeng praised Hai'an TY that posted the instantaneous synchronization of combustion in the furnace temperature and carbon monoxide, sulphur dioxide, dust, nitrogen oxides, the concentration of hydrochloric acid and other indicators to the public, and meanwhile accepted the supervision of the public. He encouraged all the TY people to hold a high sense of social responsibility, high quality standard, to operate MSW incineration power generation facilities environmentally. The same time, Environmental Protection Department will also increase the propaganda, to guide the public to recognize waste incineration, promote waste incineration power generation industry to make a healthy, environmental, standardized development.