CN
CN
[Rudong Tianying] 3# furnace was ignited successfully in the phase II of Rudong MSW
2014-06-25

        At 22:18 of 25th Nov, Jiangsu TY Environmental Protection Energy Co., Ltd, the successful ignition of 3# furnace in Rudong MSW incineration power generation project importantly ensured the competition of all the future project nodes, create favorable conditions for the next step of blowpipe, turbine impulse, 72+24 hours of operation.
         In order to get the overall organization, coordination of the engineering unit startup commissioning work, Wang Peng, the general manager of Rudong company works as commander of the command Dept for to start trial operation. Various departments, commission units, installation unit together cooperated closely, in strict accordance with the adjustment measures and operation regulations, formulate detailed commissioning plan and measures, repeatedly inspect at the boiler, air leakage, insulation air leakage test and boiler fan air flow calibration, grate and hydraulic unit system, oil ignition system, the boiler auxiliary devices, solve the various problems affecting the ignition timely. Product department, technical department overcome the tension, cross operation and many other difficulties while ensure the normal running of 1# furnace and 2# furnace, go to all lengths to the ignition preparation before operation, also to take this opportunity, elaborate organization line operators, arrange reasonable practical learning, familiar with the work, for the post operation solid technical foundation.
         The success of the furnace ignition marked the phase II of Rudong MSW incineration power generation project has entered a new stage, the trial operation has laid a solid foundation for the project start.